Live data & control

The live data are date which you can read and write in real time. This is mandatory if you want to validate your control algorithm in real life.

Procedure

  1. Get familiar with the System description (AKS) of the hard ware on site. To find out about the most important available data and controls, take a look at Single Line

  2. Get familiar with the Over steer procedure

  3. Reserve your system in advanced in the experiment scheduler scheduler

  4. You’ll get the permission to over steer the control plant on your scheduled slot.

Available Clients